| |
EZI-RAPID SOLUTIONS P/L. was founded (in Nov’06), to be EZIDEK’s Authorised Victorian Representatives/Distributors. It has since (Mar’08) become the Authorised Victorian Representatives/Distributors for RAPIDWALL Plaster Wall Systems, as well as being Victorian suppliers and installers of the DINCEL Lost-formwork Wall Systems.
 |
 |
EZI-RAPID SOLUTIONS P/L. shares its Directors & Shareholders with Link Building Group P/L Commercial, Domestic, & Maintenance Contract Builders in their own right.
“As Builders ourselves we saw the simplicity and ease of installation of the EZIDEK, RAPIDWALL, & DINCEL Systems, as being products that the Victorian & Melbourne Construction Industries could benefit from”. |
| |
|
 |
 |
EZIDEK Australia was formed in 1998 in Sydney; by a collaboration of skill and experience of the original inventors, both in construction concreting and polystyrene manufacturing. Other partners were brought in to finance the manufacture and testing of prototypes. The current system design is the product of refining the results gained in the process. EZIDEK has been operating in NSW and QLD for 9-Years, having completed many Suspended Concrete Floors for Commercial, Multi-unit Residential, and domestic construction applications. |
| |
|
 |
| |
|
 |
RAPIDWALL Was formed in the early 90’s by Rapid Building Systems and operates in three distinct areas 1) RAPIDWALL Load-bearing glass-fibre reinforced Walling System, as well as RAPIDFLOW a high strength beta plaster for the Mining, Casting & Building Industries, and as RAPID ENGINEERING a manufacturer of Plaster Calcination Manufacturing Plants. Their Australian manufacturing plant is located in Kilmore Vic it is here where all of the R & D of has RAPIDWALL evolved. They have since constructed manufacturing plants in Jianan China & Mumbai India, and are currently looking at constructing manufacturing plants in the Persian Gulf. |
| |
|
 |
| |
|
 |
DINCEL Construction System is the invention of a Sydney Engineer Burak Dincel, it is an extruded polymer (lost) form for the construction of concrete filled reinforced load-bearing walls, and they have been manufacturing DINCEL for construction installation since 2003. They to are looking at constructing manufacturing plants in various part of the world. |
| |
|
 |
The use of any of the ‘above’ Products will provide considerable construction benefits, but their use in combination can provide massive benefits construction benefits, in term of Cost & Time Savings.
EZI-RAPID SOLUTIONS P/L. its Directors, Shareholders & Staff, have had extensive Commercial & Domestic Construction experience, and are available for the construction of entire structures employing the various benefits of the ‘above’ systems.
Contact Form
For more information about any of our services, please contact us by phone, fax, e-mail, or you can fill out the online form below.
|